6 MW/24 MWh battery energy storage system in Romania
first of three phases that are envisaged to be completed at 216 MWh by next year
connected to the company’s Mireasa wind farm of 50 MW, while a 35 MW solar power plant is set to be added by the end of the year
existing Gălbiori solar power plant has just above 1 MW in connection capacity
first stage of the battery unit has 132 battery strings with a total of 114,048 lithium ion cells containing 1,240 kilometres of active material electrodes